Montgomery County Department of Transportation (MCDOT) extends the life of roads
by making full depth permanent patching, excavating deteriorated areas and repairing the road base with hot mix asphalt. The following projects will be
completed in two phases. Phase I will begin in April and includes excavations
and repairs. Phase II will occur in the fall when MCDOT completes the
resurfacing by applying the final layer of hot mix asphalt.
The work for the projects listed
below is likely to be noisy and to require daily short-term parking
restrictions. Advisory signs will be posted. Work hours will be 9 a.m. to 3
p.m., Monday through Friday. The projects are expected to take six to eight
weeks to complete, weather permitting.
The projects are:
The projects are:
- Tuckerman Lane in North Bethesda, east of MD 355
- Nebel Street in North Bethesda, between Randolph Road and Nicholson Lane,
- Scottsbury Drive in Germantown
- Epsilon Drive in Rockville
- Richter Farm Road in Germantown, between Maryland Route 118 and Maryland Route 117