The Division of Transportation Engineering recently completed rehabilitating the westbound Gude Drive bridge over the CSX and Metrorail train tracks. The bridge is located about 600 feet east of Frederick Road/MD Route 355 in Derwood.
The portion of the bridge constructed in 1968 was in poor condition. The project took more than a year to complete.